Call/whatsapp: +2348077215645, +2348176196229  Email: distinctvaluedproject@gmail.com

DISTINCTVALUED RESEARCH PROJECTS

www.dvlresearch.ng

research project writing and materials

GET COMPLETE PROJECT MATERIAL

  • BSc. N3000 – N5000
  • PGD N10,000
  • MSc. N30,000
  • PHD N60,000

CLICK HERE TO PROCESS PAYMENT

GET NEW PROJECT WRITTING

  • BSc. N8000 Per Chapter
  • PGD N10,000 Per Chapter
  • MSc. N25,000 Per Chapter
  • PHD N60,000 Per Chapter

CLICK HERE TO PROCESS PAYMENT

  • AFTER PAYMENT SEND YOUR PERSONAL DETAILS AS FOLLOWS –
  • NAME, TOPIC, DEPARTMENT, MOBILE NUMBER, E-MAIL, AMOUNT PAID TO +2348077215645 , +2348176196229 AS SMS OR WHATSAPP MESSAGE OR E-MAIL: distinctvaluedproject@gmail.com

THE FORMATION OF STRUCTURAL REINFORCEMENT OF A SINGLE STOREY RESIDENTIAL BUILDING WITH RETAINING WALL

PREFACE
This is the presentation of an information on the structural reinforcement detailing of concrete members.  Structural detailing is a branch of structural work that transposes the idea or works of a structural engineer into working drawing or easy utilization in the building construction works.  Working drawing are produced an engineer for easy use by the contractors. The processes detailing put in place was in conjunction with the recommendations of the concrete society and the institute of structural engineers.  In building construction a good interaction and contractors are required.  The methods, scats, symbols and notations must be standardized and understood by all parties in a project to minimize risks and communication hindrances. A structure is broken down into identifiable elements for detailing work like bean column, slab etc. which enables the different detailing  aspects to be fully addressed and understood.

STRUCTURAL SYMBOLS The abbreviations recommended for structural detailing work are a s follows.a. R.C. – Reinforced concrete drg – drawing hor – horizontal vest – vertical dia – diameter fdn – fordation conc – concrete col – columnb. Type of reinforcement R – Mild steel bars Y – High yield barsc. Comments relating to reinforcement C – center line B – Bottom T – Top c/c – center to centre

TABLE OF CONTENT

preface

structural symbols

table of contact
CHAPTER ONE

INTRODUCTION
CHAPTER TWO

Detailing processes

Reinforcement sizes

Notation of drawing

Bar bending

schedule

Types of drawing Margins and panels Thickness of line,

lettering and spellingDimensions

Scales
CHAPTER THREE

Reinforced Concrete
CHAPTER FOUR

Reinforced Concrete
CHAPTER FIVE

Detailing of the elements

foundation

Staircase

Retaining wall

Bibliography

Leave a Reply

Your email address will not be published. Required fields are marked *

× Make inquiry/Contact us?